1982
14
  • Fritz Rahmann
  • Location: Böckhstraße 7
    Bricks, door frames, window frames, floor drawing, chipped and piled mortar remains.


    The plan to expand the studio in the middle area of the 4th floor of the building into a large central room with two window fronts led to the demolition of the partition walls. Demolition executed by Raimund Kummer and Hermann Pitz. Building rubble and bricks were moved to a neighbouring room.

    Fritz Rahmann cleaned the bricks of adhering mortar in a meditative process lasting several months, which he documented with an audio recording, and reconstructed the demolished walls in horizontal position according to the still visible ground plan. The chipped mortar was piled up in another room. The resulting work, STEINE, became the starting point and was at the same time a part of the exhibition project organized by Rahmann as an overall form.


    Documentation

    Audio recording of the sounds made when chipping off mortar residue from bricks of a broken wall
    Dokumentation
    8 images

    Dokumentation
    10 images

    Prevous Page Exhibition 20–27 June Bogomir Ecker, Harald Klingelhöller, Wolfgang Luy – Game for three
    Next Page Exhibition 20–27 June 4th floor: Juan Muñoz