- In the Theatre
- Stephan Huber, Marie Eugenie Hinrichs
"Bridge building"
Red framed construction elements, 2 actors. Installation time: 24 hours
Two performers dressed in gray (woman and man) installed a red-framed structure reminiscent of a suspension bridge across the entire width of the stage during the 24-hour-event. The bridge was left in an unfinished state for the entire duration of the event.
Red framed construction elements, 2 actors. Installation time: 24 hours
Two performers dressed in gray (woman and man) installed a red-framed structure reminiscent of a suspension bridge across the entire width of the stage during the 24-hour-event. The bridge was left in an unfinished state for the entire duration of the event.